Currency RUB
Balancing and commissioning and start of diesel-generator installation in operation are a stage which has to be carried out by the certified experts according to the obligatory requirement of manufacturer. order in Ivanteevka
ALL.BIZ Russia Russia services Industrial equipment Interior decorations Balancing and commissioning Setting up and initial operation works Balancing and commissioning and start of diesel-generator installation in operation are a stage which has to be carried out by the certified experts according to the obligatory requirement of manufacturer.
Order Balancing and commissioning and start of diesel-generator installation in operation are a stage which has to be carried out by the certified experts according to the obligatory requirement of manufacturer.
Balancing and commissioning and start of diesel-generator installation in operation are a stage which has to be carried out by the certified experts according to the obligatory requirement of manufacturer.

Balancing and commissioning and start of diesel-generator installation in operation are a stage which has to be carried out by the certified experts according to the obligatory requirement of manufacturer.

Reconfirm the price with seller
Russia, Ivanteevka
(View map)
Description
Enters the volume of Balancing and commissioning: - control of compliance of the performed works to the project, - control or DGU gas station working liquids (oil, antifreeze, electrolyte in rechargeable batteries), - check of correctness of electric connections, - carrying out test of DGU on all modes with removal of characteristics, - adjustment of output characteristics (in case of need), - delivery of DGU to the customer with registration of acts of commissioning, - instructing of the Customer about rules and working methods with DGU.
Contact the seller
Balancing and commissioning and start of diesel-generator installation in operation are a stage which has to be carried out by the certified experts according to the obligatory requirement of manufacturer.
Balancing and commissioning and start of diesel-generator installation in operation are a stage which has to be carried out by the certified experts according to the obligatory requirement of manufacturer.
for
by the goods
Your message must contain at least 20 symbols. The message must not be more than 2000 symbols.
Obligatory field is not filled
The field is wrongly filled
The field is wrongly filled
Compare0
ClearSelected items: 0