Currency RUB
Pump station pneumatichydraulic with a proportional control system of the stand buy in Penza
Buy Pump station pneumatichydraulic with a proportional control system of the stand
Pump station pneumatichydraulic with a proportional control system of the stand
nasosnaya_stanciya_pnevmogidravlicheskaya_s
nasosnaya_stanciya_pnevmogidravlicheskaya_s

Pump station pneumatichydraulic with a proportional control system of the stand

Products from producer
In stock
Reconfirm the price with seller
Payment:
Shipping:
  • Customer pickup,
  • Courier,
  • Transport company
  • In detail
Russia, Penza
(View map)
Technical characteristics
  • BrandПКТБА
Description

APPOINTMENT:

  • pressure source for carrying out hydraulic tests of the vessels working under pressure;
  • control panel test bench;
  • independent source of pressure.

EXECUTION OPTIONS:

  • PKTBA-PGS-PS – installation is equipped with system of proportional management of clip pressure. Use of the programmable logical controller allows to carry out tests of fittings in the safe mode, excepting the axial compression rendered on the case during tests.
  • PKTBA-PGS-M – mobile version of installation allows to carry out tests on the place of operation by means of caps.
  • PKTBA-PGS-A – installation allows to carry out tests of fittings in the semi-automatic mode. In addition it can be equipped with system of proportional management of clip pressure.

FUNCTIONS:

  1. Creation of pressure of liquid to 160 MPas.
  2. Smooth (stepless) management of pressure:
  • hydrotests 1,0... 160 MPas;
  • pneumotests 0,05... 1 MPas (0,5... 20 MPas or 1 … 40 MPas).
  1. Smooth management of a clip of a hydraulic cylinder of the test bench.
  2. Automatic maintenance of the established pressure.
  3. Measurement of leakages in a lock of the tested product drop and vesiculate by methods.
  4. Control over process of tests by means of panel manometers with a margin error measurements of 1,0% (0,6% - upon the demand of the customer) and pressure sensors an error of measurement of 0,25%.
  5. Unions for installation of control manometers with the required error are provided in a design of PKTBA-PGS.

 

ADVANTAGES:

  • In the scheme of management the pneumooperated locking elements are applied. It exempts the operator from need to open and close numerous gates and does management of the station simple and reliable.
  • Stations have a separate line of filling for reduction of time of preparation for tests.
  • For convenience of operation control of a hydraulic cylinder of a clip of the test bench can be exercised both from the control panel, and by means of a portable pedal.
  • The scheme of external connections is executed with application of quick disconnect connections with the guaranteed resource of work of 10000 cycles. It considerably reduces time necessary for performance of preparatory and final operations.
  • On an input of water the filter of thin water purification prolonging service life of the station is installed.
  • Possibility of a complete set of PKTBA-PGS-PS system of filling of the tested products with water.
  • High precision of measurement of pressure of test by means of the built-in sensors of pressure with a margin error 0,25% (PKTBA-PGS-PS).

 

COMPLETE SET:

  • installation for creation of pressure with the control panel of stands:

- 1 or 2 pneumatichydraulic animators

(depending on model);

- equipment of control, regulation and management.

  • oil hydroelectric power station;
  • device of measurement of leakages of air and water;
  • air preparation block;
  • filters of rough and thin water purification;
  • pedal of management of process of a clip of a product at test;
  • set of sleeves of high pressure with quick disconnect connections;
  • set ZIP.

 

 

Shipping method
Payment method
Contact the seller
Pump station pneumatichydraulic with a proportional control system of the stand
Pump station pneumatichydraulic with a proportional control system of the stand
We recommend to see
for
by the goods
Your message must contain at least 20 symbols. The message must not be more than 2000 symbols.
Obligatory field is not filled
The field is wrongly filled
The field is wrongly filled
Compare0
ClearSelected items: 0